Thermic Fluid Heaters

Indirect thermal-oil heating systems engineered for consistent, closed-loop process heat.

What We Provide

Thermic fluid heater design and manufacturing
Closed-loop thermal-oil circulation system integration
Site installation and commissioning
Fuel-flexible burner and combustion system integration
Control panel and safety interlock setup
Post-installation maintenance and service support

Overview

Thermic fluid heaters circulate heated thermal oil through a closed loop to supply process heat, rather than generating steam directly. This makes them well suited to processes that need high operating temperatures at comparatively low system pressure.

A K Engineering designs, manufactures and installs thermic fluid heater systems, sizing the heater and circulation loop to match your process temperature and heat-load requirement.

Our scope covers the full project lifecycle -- requirement study, engineering design, fabrication, site installation and commissioning -- along with ongoing maintenance support.

Specifications

Fuel Options
Coal, wood/biomass, agro-waste, furnace oil, diesel, natural gas/PNG, LPG or electric-fired configurations

Applications

Process heating for chemical and process industriesDrying and curing processesReactor and jacketed-vessel heatingTextile processing (dyeing, stenters)Food processing heat applications

Industries Served

Pharmaceutical
Chemical
Food & Beverage
Textiles
Automotive
Power Generation

Benefits

High process temperatures at low system pressure
Closed-loop design reduces water treatment overhead
Fuel-flexible designs suited to different plant setups
Uniform heat delivery across connected process equipment
Ongoing maintenance and service support after handover

Engineering & Manufacturing Process

01

Site Survey & Requirement Study

We assess your process heat-load, required operating temperature and site conditions to size the right system.

02

Engineering Design & Drawing Approval

Detailed engineering drawings for the heater and thermal-oil circulation loop are prepared and shared for review.

03

Manufacturing & Fabrication

The heater and associated components are fabricated under quality checks at each stage of production.

04

Dispatch & Site Installation

The system is transported and installed at your facility, with piping and utility interfaces coordinated in advance.

05

Commissioning & Handover

The thermal-oil loop is charged, commissioning tests are carried out, operators are briefed on safe operation, and the system is handed over ready for use.

Installation & Commissioning

Installation begins with confirming site readiness -- foundation, flue routing, thermal-oil piping runs, fuel supply and electrical connections are checked against the approved drawings before equipment arrives.

Once positioned, the heater, expansion tank, circulation pumps and control panel are connected, and the thermal-oil loop is charged as part of commissioning.

Commissioning includes functional testing of safety interlocks and controls, and a handover briefing so plant operators understand safe start-up, running and shutdown procedures.

A K Engineering remains available for follow-up maintenance and service after installation.

Let's Discuss Your Thermic Fluid Heaters Requirement

Share your requirement with A K Engineering and our team will get back to you with a tailored quotation.

Call NowWhatsApp Us